Dubai · Riyadh · Bahrain · Cairo · AmmanEN · AR

Egypt · ERP, CRM and HR for Egyptian companiesBuilt for Egypt's rules, from the ETA to social insurance.

One system for finance, sales, HR and payroll, projects and assets, with the Egyptian rules inside: the ETA e-invoice on every sale, 14% VAT, social insurance at the dated rates and ceilings, income tax withheld in the run, EGP reporting, Arabic on every screen. Electro Cable Egypt runs on it.

EGP reportingETA integratedArabic and EnglishCairo · +20 101 999 4336
SalesFinancePayrollTaxReportsMore
AS
E-invoice
September 2026Submit
INV-26-0872 · E-INVOICE
Copper cable, 3-core, 240 mm²
Nile Delta Contracting · 6th of October · from SO-26-0214
Valid
EGP1,368,000.00 net 1,200,000 · VAT 14% 168,000
  • Issued
    Mona Hassan · sales · 10:12
  • Approved
    Amr Salah, finance manager · 10:30
  • ETA
    Submitted 10:31 · GS1 item codes · UUID returned
  • Posted
    JV-26-0455 · EGP · period September
PDF · AR / ENCredit note Ask AI
Submission to the ETA
10:31Submitted · signedSubmitted
10:31Valid · UUID returnedValid
10:33Sent to the customer · AR / ENSent
This month September
Valid214
Credit notes9
Rejected2
Median to valid40 s
Stack AIMy company
Which contracts end in the next 60 days?

Three contracts end in October, and one employee needs Form 6 before the insurance office closes the month.

3ending
1form
19 daysto the first
EMP-0418Karim Fawzy · ends 13 Octrenewal not started · 19 days19 d
EMP-0392Dina Adel · ends 29 Octrenewal drafted · 35 days35 d
Remind HR to renew the three contracts by email
Send the remindersReminders sentNothing is sent before you clickThree reminders · on the files
The life cycle

An Egyptian month, and what the system does at each step.

One ledger for the sale, the e-invoice and the payroll, one employee file for the insurance forms, and EGP as the reporting currency from the quotation to the close.

1
Quotation in ArabicQT-26-0233
  • Arabic and English on one quotation, 14% VAT by line
  • Approved, then converted to the sales order SO-26-0214
2
E-invoice to the ETAINV-26-0872
  • GS1 item codes, signed with the company's token, then submitted
  • Valid with its UUID in 39 seconds; the PDF carries it
3
Credit note to the ETAwhen needed
  • A correction is a credit or debit note that references the original; the invoice itself is never edited
  • Signed and submitted the same way, with the reason on the note
4
PayrollRUN-2026-09
  • Social insurance on the insurable wage, at the rates in force
  • Income tax by bracket after the personal exemption; payslips in the app
5
Insurance formsForms 1, 2 and 6
  • Joining, wage change and leaving, printed from the employee file in Arabic
  • Contracts and their expiry on the same file, with reminders
6
Period close in EGPalways
  • The VAT return figures from the ledger, by rate
  • Closed in EGP, each foreign-currency document at the rate of its day, in ERP Core
The Egyptian rules, in the product

Eight things an Egyptian company needs on day one.

Each one is a setting with a date, not a customisation. When the ETA, the insurance authority or the ministry change a rate, a ceiling or a wave, the new value applies from its day and the old runs stay as they were.

Set up for
EgyptUAESaudi ArabiaJordanBahrainQatarKuwaitOman
INV-26-0872 · ETA E-INVOICEEGP
LineQtyUnit priceEGP
Copper cable, 3-core, 240 mm²400 m3,000.001,200,000.00
VAT 14%168,000.00
Total1,368,000.00
UUID4b7e … 21d9
StatusValid
ETA e-invoice
Every invoice coded with GS1 or EGS item codes, signed and submitted as JSONThe ETA e-invoicing guide. The UUID comes back to the record and prints on the PDF; a rejection reopens the document with the reason.
Credit notes
A correction is a credit or debit note that references the original invoice; nothing issued is editedSigned and submitted to the ETA the same way, with the reason on the note.
VAT 14%
Standard, exempt and zero-rated by line, with the table tax where it appliesThe return figures come from the ledger, by rate and by month.
Social insurance
Employee and employer shares at the rates in force, on the insurable wageBetween the floor and the ceiling announced each January; the new values apply from their date.
Income tax
Progressive brackets and the personal exemption, applied in the runThe monthly withholding ready for the return by the fifteenth of the following month.
Insurance forms
Joining, wage change and leaving forms, printed from the employee fileIn Arabic, with the file's own figures, when the event happens.
Arabic
Arabic or English on every screen, chosen by each userInvoices, payslips and letters print in the language the reader needs, right to left.
EGP
EGP as the reporting currency, with dated ratesEvery foreign-currency document keeps the rate of its day, in a history nothing overwrites.

Bring one invoice and one payslip. The demo submits your invoice to the ETA's test portal and runs one payroll with social insurance, on a tenant set up for Egypt.

Book a demo in Cairo
Nine modules

ERP, CRM and HR software for Egypt: six products, and the three things they share.

Each product runs on its own or in the suite, carries its Egyptian settings and posts to one ledger in EGP.

INV-26-0872 · Nile Delta ContractingValid
Copper cable, 3-core, 240 mm²1,200,000.00
VAT 14% · total168,000 · 1,368,000
JournalJV-26-0455 · EGP
Periods · 2026EGP
Augustclosed · 4 Sep
Septemberopen · checklist 6 of 9
VAT return · Augustfrom the ledger
01

ERP Core

The ledger every product posts to, with every invoice submitted to the ETA.

  • E-invoices to the ETA, 14% VAT by line
  • EGP reporting, each document at the rate of its day
  • Periods with a close checklist · See ERP Core
QT-26-0233 · Nile Delta ContractingConverted
Copper cable, 3-core, 240 mm²1,200,000.00
VAT 14% · total168,000 · 1,368,000
Printed inArabic and English
Mona Hassan · Q3 targetEGP
Target9,000,000
Credited to date6,390,000 · 71%
Open · closing this quarter3 deals
02

CRM

Every lead to a signed order, with the quotation in Arabic and the VAT on it.

  • Quotations in Arabic with 14% VAT
  • WhatsApp on the record
  • Targets per team · See CRM
RUN-2026-09 · CairoPaid
Employees112
Social insurance · employer 18.75%EGP 283,800
Income tax withheldEGP 212,400
Payslip · Dina AdelPaid
Gross · basic and allowances13,000.00
Social insurance 11% · income tax-2,556.50
NetEGP 10,443.50
03

HR & Payroll

Social insurance and income tax in the run, and the insurance forms from the file.

  • End of service by the Egyptian law
  • Contracts with their expiry and reminders
  • Forms 1, 2 and 6 in Arabic · See HR & Payroll
JOB-26-0031 · substation cabling58% spent
Budget2,400,000
Actual cost, from the ledger-1,392,000
Remaining1,008,000
Milestones · JOB-26-00312 of 4 done
Trenching and ductsdone · 27 Aug
Cable layingdone · 10 Sep
Terminations and testsin progress · 8 Oct
04

Project Management included

Every job against its budget, in pounds. Included with CRM and with ERP Core.

AST-26-0142 · Extrusion line 2In service
Location10th of Ramadan · hall B
Last scanbarcode · 22 Sep
Net book valueEGP 6,840,000
Depreciation · August 2026posted
1,206 assetsEGP 1,912,400
JournalJV-26-0391
Septemberposts 3 Oct
05

Asset Management

The register, custody with approval, maintenance and depreciation to the ledger.

Nile Valley Industries · one ledgerSeptember
Sales · e-invoices216 to the ETA
Payroll · RUN-2026-09posted · 24 Sep
Depreciation · AugustJV-26-0391
Approval · INV-26-087219 min
✓Mona Hassan · issued10:12
✓Amr Salah · finance manager10:30
✓ETA · valid10:31
06

ERP all in one

The five products on one ledger, with one sign-in, one approval engine and one audit trail.

  • One tenant for every company in the group
  • Approved on the phone
  • Stack AI within permissions · See the ERP
PRD-26-0058 · cable, 3-core, 240 mm²Closed
Finished goods4,000 m · 10 drums
Materials consumedper stage
Real cost per metreEGP 2,410.60
BOM · cable, 3-core, 240 mm²3 stages
Drawing and strandingcopper rod 8 mm
InsulationXLPE
Armouring and sheathsteel wire, PVC
07

Production ERP add-on

For Egypt's factories: bills of materials, production orders that pull from the warehouse, the real cost per unit.

  • Consumption and quality per stage
  • Batches and serials
  • Cost to the ledger · See Production ERP
Payroll · Riyadh · SeptemberSAR
GOSI · employee and employerby cohort, with its ceiling
SANEDemployee and employer
Mudad filefrom the approved run
Group · SeptemberEGP
Egypt · Cairo112 · EGP
Saudi Arabia · Riyadh38 · SAR
Group reportin EGP
08

Several countries on one run

A group with companies in Egypt and the Gulf runs one payroll, each company under its own country's rules.

  • GOSI, WPS and social insurance on one run
  • Each country's rules as settings with dates
  • One tenant, several laws, one group report
INV-26-0872 · PDFAR / EN
Arabic copyright to left
English copythe same figures
UUIDprinted on both
Reporting currencyEGP
PO-26-0188 · USDrate of 9 Sep
PINV-26-0311 · USDrate of 21 Sep
Rate historynothing overwritten
09

Arabic and EGP

Every user chooses Arabic or English, and every report totals in pounds.

  • Documents print right to left
  • EGP reporting with dated rates
  • Payslips and forms in Arabic
Product tour

Four pages an Egyptian finance office lives in.

The e-invoices of the month with their status, one invoice the ETA accepted, the payroll run with its social insurance and income tax, and the insurance forms of the month.

SalesFinancePayrollTaxReportsMore
AS
E-invoices · September
September 2026Submit
Valid214accepted by the ETA
Credit notes9each referencing an invoice
Rejected2item code · tax type
Median to valid40 sfrom submission
216 e-invoicesSorted by date
InvoiceCustomerDateEGPETAStatus
INV-26-0872from SO-26-0214Nile Delta Contracting24 Sep1,368,000.00UUID 4b7e … 21d9Valid
INV-26-0871from SO-26-0213Canal Cable Traders24 Sep273,600.00UUID a03c … 9e54Valid
INV-26-0870from SO-26-0209Upper Egypt Power Works23 Sep110,010.00item code missingRejected
INV-26-0869from SO-26-0207Giza Electrical Supplies23 Sep583,680.00UUID 77d1 … 0c3bValid
INV-26-0868from SO-26-0205New Capital Fit-Out22 Sep77,520.00UUID e5a8 … 4f60Valid
INV-26-0867from SO-26-0201Delta Grid Contracting22 Sep210,900.00UUID 19bf … d27aValid
SalesFinancePayrollTaxReportsMore
AS
E-invoices · September
INV-26-0872 · E-INVOICE
Copper cable, 3-core, 240 mm²
Nile Delta Contracting · 6th of October · from SO-26-0214 · issued by Mona Hassan · Thu 24 Sep 2026
ValidETA · 10:31
EGP1,368,000.00
net 1,200,000.00 · VAT 14% 168,000.00
LinesSubmissionJournalReceiptsHistory
PDF · AR / ENCredit noteAsk AI
LineItem codeQtyUnit priceEGP
Copper cable, 3-core, 240 mm²XLPE, armoured · one drumGS1 6224008571239400 m3,000.001,200,000.00
VAT 14%standard rate, on the line—14%168,000.00
Total1,368,000.00
SubmissionByTimeReferenceStatus
Approved · finance managerAmr Salah10:30—Approved
Signed with the company's token, submittedSigning client10:31:02document v1.0Submitted
Valid · UUID returnedETA10:31:414b7e … 21d9Valid
Kept on the record: the signed document, the UUID the ETA returned and the Arabic and English PDF that prints it; JV-26-0455 posted the revenue, the VAT and the receivable in EGP.
SalesFinancePayrollTaxReportsMore
AS
Payroll run · September
RUN-2026-09 · CairoExport
Employees1124 joined · 1 left
Net payEGP 1,508,300paid Thu 24 Sep
Social insurance · employerEGP 283,80018.75% · employee 11% 166,496
Income tax withheldEGP 212,400for the return by 15 Oct
112 employeesSorted by number
EmployeeGradeGrossInsurable wageSocial insurance 11%Income taxNet
EMP-0105Hossam RagabE2 · production engineer14,200.0013,300.001,463.001,359.9011,377.10
EMP-0211Mahmoud SaberW3 · machine operator9,850.009,200.001,012.00580.108,257.90
EMP-0237Yasmin FaroukS2 · HR officer11,400.0011,400.001,254.00841.709,304.30
EMP-0301Tarek MansourS1 · storekeeper8,600.008,600.00946.00343.307,310.70
EMP-0392Dina AdelS3 · accountant13,000.0013,000.001,430.001,126.5010,443.50
EMP-0418Karim FawzyW4 · maintenance technician10,750.009,600.001,056.00751.308,942.70
SalesFinancePayrollTaxReportsMore
AS
Insurance forms
September 2026Print · AR
Form 1 · joining4new hires in September
Form 2 · wage change1EMP-0105 · from 1 Sep
Form 6 · leaving1to file before the month closes
Contracts ending · 60 days3the first on 13 Oct
6 formsSorted by event date
EmployeeFormEventDateStatus
EMP-0377Sherif NabilForm 6Leaving · resignation20 SepTo file
EMP-0464Ahmed ZakiForm 1Joining · machine operator20 SepPrinted
EMP-0463Nour SamyForm 1Joining · quality inspector13 SepFiled
EMP-0105Hossam RagabForm 2Wage change · grade E21 SepPrinted
EMP-0462Omar HegazyForm 1Joining · sales engineer1 SepFiled
EMP-0461Mariam LotfyForm 1Joining · accountant1 SepFiled

See these screens on your own numbersSample data on every screen.

Customers

Two Egyptian manufacturers run on it.

Full ERP

Electro Cable Egypt runs a complete ERP with CRM, supply chain, finance and asset management, with the Egyptian Tax Authority's e-invoicing built in.

Electro Cable EgyptCable manufacturing, EgyptRead the case
Full ERP

Raif Textile and Curtains runs the full ERP across supply chain and finance, HR, CRM and asset management, with one stock ledger from fabric to finished curtain.

RAIF Textile and CurtainsTextile manufacturing, EgyptRead the case
Egypt, in use at
Egypt's Ministry of Industry RAIF Textile and Curtains Madinet Masr Ellithy Arabian Farms Arab Dairy Safety Point
Partners

Trusted and recommended by

  • UAE etisalat by e&

    The UAE's national operator.

  • Bahrain Batelco Cloud ERP

    A white-label edition, hosted on Batelco's infrastructure.

  • Jordan Umniah

    CRM for lead management and forecasting.

  • Egypt Ministry of Industry

    An agreement signed with the Ministry of Industry in Egypt.

Request a demo in Cairo

Hosting

Hosted in the region, recoverable from Europe.

Production runs in the UAE and in Saudi Arabia, so your data stays in the region. A separate disaster-recovery site in Europe stands behind both.

Runs onOracleCloud Infrastructure

EuropeDisaster recovery
Saudi ArabiaProduction region
UAEProduction region
Encrypted backups, recovery site
99.9% availabilityThe monthly SLA for hosted production.
Encrypted backupsAutomatic, encrypted and access-controlled.
24 × 7 for critical incidentsPriority 1 support around the clock.
Cloud or on-premisesOurs, your own servers, or a telco cloud in Bahrain.
Connects to
  • Microsoft 365
  • ETA e-invoicing portal
On the phone

Approvals and payslips, on the phone, in Arabic or English.

An e-invoice, a leave request or a purchase order reaches the approver's phone with what the step needs. Every employee reads the payslip on the day it is paid, in Arabic or English.

A push for each document waiting at your step: the e-invoice with its total and item codes, the leave with the balance, the order with its supplier. One tap approves, and the approved invoice is ready to sign and submit to the ETA.

Each month's payslip in Arabic or English, with the social insurance and income tax lines as the run worked them out. Download it as a PDF; Stack AI answers from the same payslip.

08:52
Approvals
Waiting · 2Done today · 4All
  • INV-26-0881 · E-invoiceEGP 412,000 + VATDelta Grid ContractingGS1 codes complete · Mona Hassan
    Your step2 of 2
  • LV-26-0144 · Annual leaveDina Adel · 4 to 8 Oct5 days · balance 14 days · accountant
    Your step1 of 2
  • PO-26-0196 · Purchase orderPVC compound · 12 tAl Amal Polymers · EGP 696,000
    Approved08:40
✓Approve INV-26-0881
HomeApprovalsLeaveReportsMe
09:05
My payslip
SeptemberAugustJuly
  • September 2026 · net payEGP 10,443.50Paid Thu 24 Sep · bank transfer
    Paid24 Sep
  • EarningsBasic salaryGrade S3 · 30 days
    9,100.00EGP
  • EarningsAllowancesTransport and meals
    3,900.00EGP
  • DeductionSocial insurance 11%On the insurable wage 13,000
    −1,430.00EGP
  • DeductionIncome taxBy bracket, after the exemption
    −1,126.50EGP
✓Download · AR
HomeApprovalsLeaveReportsMe
ApprovalsMy payslip
Submission, traced

Every accepted invoice keeps its UUID and its signature.

The signing client signs the invoice with the company's token, and it is submitted from the invoice itself; the ETA's answer comes back to the same record, and the PDF the customer receives carries the UUID. Nothing is keyed twice on the ETA portal.

  • Signed before it leaves. Each invoice is signed with the company's token; an unsigned invoice never reaches the ETA.
  • The UUID on the record. The UUID the ETA returns stays on the invoice and prints on its PDF, in Arabic and English.
  • A rejection reopens the document. The ETA's reason comes back to the invoice, which reopens for the correction and a new submission.

The invoice posts to ERP Core in EGP. See ERP Core

Details

Small things a finance manager notices in the first month.

For the finance office

Rates and ceilings with a date

VAT, the insurance rates and ceilings and the tax brackets are dated tables; a change applies from its day, and a closed run never moves.

Arabic printouts

Invoices, payslips and the insurance forms print in Arabic, right to left, with an English copy of the same figures.

The reason on the document

When the ETA rejects an invoice, its reason is written on the invoice itself, so it is corrected where it was raised.

For IT

Single sign-on

Microsoft Entra ID, Google or OpenID Connect, on the accounts IT already manages.

Roles per document

View, create and manage for invoices, payroll, forms and assets separately; approving an invoice and approving a run are rights of their own.

Cloud or on-premises

In our cloud, with production in the UAE and Saudi Arabia and disaster recovery in Europe, or on your own servers.

Book a demo in Cairo

See it on your own numbers, in pounds.

A consultant walks you through the products you pick on a tenant set up for Egypt: EGP, 14% VAT, the ETA in test mode, social insurance and income tax in the run, Arabic screens. Forty-five minutes, online or at your office in Cairo, Giza, Alexandria or 6th of October; the reply comes within one working day.

Contact information

Your request

Products
Industry-specific products
What would you like?
Rather talk now? UAE+971 50 220 8017 KSA+966 56 643 9540 Egypt+20 101 999 4336