Manufacturing ERP · Production ERP · UAE, KSA, EgyptFrom the bill of materials to the real cost of the unit.
Products with their stages and materials. Production orders cloned from the template, materials issued from the store or pulled directly, consumption and quality per stage, and the finished goods received at what the run really cost. An add-on to ERP Core, with purchasing, inventory and sales invoicing included.
- Materials7 lines · GTN-26-0455 from the main store · 14 Sep · issued
- Stages4 of 4 closed · quality approved on curing
- FinishedGRN-26-0802 · 120 units · 28 Sep · production warehouse
- Sold at1,312.50 on SO-26-0144 · margin 17%
AED 1,085 per unit on PRD-26-0031. Materials 820, the four stages 205, crane hire 60. The standard cost on the product still says 1,140.
Bill of materials to finished goods, and what happens at each stage.
A product is defined once with its stages and materials; every order clones them, draws its materials, runs its stages and receives the finished goods at the cost the run really had. Every note posts to the ledger.
- Template stages and materials with waste per line, set once
- Imported from Excel: a Stages sheet and a Materials sheet
- Stages and materials cloned from the product, times the quantity
- Planned dates, priority, branch and production warehouse
- From the store to the production warehouse, approved by its owner
- Or pulled directly when the line holds its own stock
- Consumption per stage, pause and resume, quality approved or rejected
- Inspection plans with their parameters on the stage
- One receipt at the real cost: materials, stages and extra cost over the quantity
- Batches, serials and expiry on receipt
- Delivered on the sales order, the nearest expiry first
- Every note posted to ERP Core
Batches, expiry dates and VAT on the invoice.
Built for manufacturers in the Gulf and Egypt, from offices in Dubai, Riyadh, Bahrain, Cairo and Amman.
| Line | Qty | AED |
|---|---|---|
| Materials · 7 lines, waste included | × 120 | 98,400 |
| Reinforcement · stage 1 | 3 days | 5,400 |
| Casting · stage 2 | 3 days | 8,800 |
| Curing · stage 3 · quality approved | 7 days | 6,400 |
| Finishing and QC · stage 4 | 2 days | 4,000 |
| Extra cost · crane hire | — | 7,200 |
| Cost of the run | 120 units | 130,200 |
Bring one product and its bill of materials. The demo runs a production order on it, from the materials issue to the finished goods at real cost, on a tenant set up for your country.
Request a demoEight things a plant needs that a generic ERP does not have, and the ERP Core they sit on.
Bills of materials, stages, orders, the materials issue, consumption and quality, finished goods at real cost, batches and the warehouses. Purchasing, sales and the ledger come with ERP Core.
Products and bills of materials
Each finished product carries its template stages and materials, with waste per line.
- Stages in order, each under a parent step
- Materials per stage, with their waste
- Import from Excel: Stages and Materials sheets
Stages and inspection plans
Template stages per product, each with its cost and the parameters its inspection checks.
- Cloned into every order
- Parameters copied to the order's stage
- A stage can be kept out of the unit price
Production orders
Pending, in progress, closed or cancelled; stages and materials cloned from the product.
- Planned dates and priority
- Quantities from the bill times the order
- Filters by product, branch, status and dates
Materials issue
A transfer from the store to the production warehouse, or materials pulled straight from the line's own stock.
- Approval by the warehouse's owner
- The mirror receipt written on approval
- Short stock refused at the note
Consumption and quality per stage
A consumption note per stage; the stage paused or resumed, its quality approved or rejected.
- A rejected stage stays out of the cost
- Quality status on the stage
- Posted to ERP Core as consumption
Finished goods at real cost
One receipt for the finished product, priced at what the run really cost, into the production warehouse.
- Stage costs, extra cost and materials over the quantity
- Batches and serials on receipt
- The standard cost updated when you say so
Batches, serials and expiry
Every stock line knows its batch, serial, expiry, colour and location; serialised units are one row each.
- Batch numbers on receipt, or assigned later
- Issue by expiry, the nearest first
- Barcodes printed from the label
Warehouses and stock notes
Stock is the sum of its notes: nine note types with their signs, no stored balance to drift.
- Receipts, issues, transfers, consumption, returns
- A pending issue already reduces stock
- Stock take and opening values by import
ERP Core the base
Purchasing of the materials, sales orders and deliveries, invoices and the ledger come with the base.
- Purchase orders to receipts to supplier invoices
- Sales orders, deliveries, e-invoicing
- Every note posted · See ERP Core
Four pages a plant lives in.
The orders of the month with their stage, one order with its stages and cost, the bill of materials behind it, and the finished goods by batch.
| Order | Product | Qty | Planned | Stage | Status |
|---|---|---|---|---|---|
| PRD-26-0034for stock | Precast panel, type C | 40 | 28 Sep to 12 Oct | 0 of 4 | Pending |
| PRD-26-0033SO-26-0151 | Precast panel, type A | 60 | 21 Sep to 5 Oct | 2 of 4 · casting | In progress |
| PRD-26-0031Tarfa · PO-26-0412 | Precast panel, type B | 120 | 14 to 28 Sep | 4 of 4 | Closed |
| PRD-26-0030for stock | Precast panel, type C | 20 | 7 to 21 Sep | 4 of 4 | Closed |
| PRD-26-0028SO-26-0139 | Precast panel, type A | 80 | 24 Aug to 9 Sep | 4 of 4 | Closed |
| PRD-26-0027for stock | Precast panel, type B | 40 | 20 Aug to 4 Sep | 4 of 4 · one recast | Closed · rejected stage |
| Stage | Dates | Consumption | Cost | Status |
|---|---|---|---|---|
| 1 · Reinforcementmesh A252, lifting inserts | 14 to 16 Sep | GCN-26-0611 | 5,400.00 | Closed |
| 2 · Castingconcrete, admixture, release agent | 17 to 19 Sep | GCN-26-0614 | 8,800.00 | Closed |
| 3 · Curing7-day strength 32 MPa · inspection plan | 20 to 26 Sep | — | 6,400.00 | Approved |
| 4 · Finishing and QCinsulation board | 27 to 28 Sep | GCN-26-0619 | 4,000.00 | Closed |
| Materials 98,400 · crane hire 7,200 | 130,200.00 | the run |
| Stage | Material | Per unit | Waste | Rate | AED |
|---|---|---|---|---|---|
| 1 · Reinforcement | Rebar mesh A252 | 60 kg | 3% | 3.25 | 195.00 |
| 1 · Reinforcement | Lifting inserts | 4 | — | 45.00 | 180.00 |
| 2 · Casting | Cement CEM I | 0.45 t | 4% | 400.00 | 180.00 |
| 2 · Casting | Aggregates 20 mm | 1.20 t | 4% | 100.00 | 120.00 |
| 2 · Casting | Admixture | 2.4 kg | — | 12.50 | 30.00 |
| 2 · Casting | Release agent | 1.5 L | — | 16.00 | 24.00 |
| 4 · Finishing | Insulation board | 1 | — | 91.00 | 91.00 |
| Product | Batch | Received | Qty | Cost | Value | Status |
|---|---|---|---|---|---|---|
| Precast panel BPRD-26-0031 | B-26-0931 | 28 Sep | 120 | 1,085.00 | 130,200 | Reserved |
| Precast panel CPRD-26-0030 | C-26-0921 | 21 Sep | 20 | 1,460.00 | 29,200 | Available |
| Precast panel APRD-26-0028 | A-26-0928 | 9 Sep | 80 | 1,210.00 | 96,800 | Available |
| Precast panel BPRD-26-0027 | B-26-0904 | 4 Sep | 40 | 1,152.00 | 46,080 | Available |
| Precast panel APRD-26-0024 | A-26-0812 | 12 Aug | 32 | 1,198.00 | 38,336 | Available |
See these screens on your own productsSample data on every screen.
Chosen by manufacturers and contractors in the region.
RAIFFull ERPRaif Textile and Curtains runs the full ERP across supply chain and finance, HR, CRM and asset management, with one stock ledger from fabric to finished curtain.
Electro Cable Egypt runs a complete ERP with CRM, supply chain, finance and asset management, with the Egyptian Tax Authority's e-invoicing built in.
CRM, HR & Payroll, AssetsI highly recommend CS ERP to any business looking for a comprehensive and customizable solution. Their excellent customer support and ongoing updates ensure we're always getting the most out of their software.
Trusted and recommended by
-
UAE etisalat by e&
The UAE's national operator.
-
Bahrain Batelco Cloud ERP
A white-label edition, hosted on Batelco's infrastructure.
-
Jordan
Umniah
CRM for lead management and forecasting.
-
Egypt
Ministry of Industry
An agreement signed with the Ministry of Industry in Egypt.
Hosted in the region, recoverable from Europe.
Production runs in the UAE and in Saudi Arabia, so your data stays in the region. A separate disaster-recovery site in Europe stands behind both.
Runs onCloud Infrastructure
Microsoft 365
Shopify
External systems too: the store's orders through Shopify, the books in ERP Core, and a REST API on every module for the systems you already run.
Transfers approved, stages closed, from the floor.
A transfer to the line, a consumption note or a quality decision reaches the supervisor's phone with the figures the step needs. The stage list shows what is running, paused and due, and records consumption from the row.
A push for each note waiting at your step: the transfer with its lines, the consumption with its quantities, the quality with its reading. One tap approves.
Running, paused, closed, due next, with the order and the quantity beside each. Consumption is recorded from the row; Stack AI answers from the same list.
- GTN-26-0461 · Transfer to Line 1Cement CEM I · 27 tFrom the main store · PRD-26-00333 lines · aggregates 72 t · admixture 144 kgYour step1 of 1
- GCN-26-0622 · Stage 2 castingPRD-26-0033 · 60 unitsConcrete poured · 31 of 60 castYour step1 of 2
- Quality · stage 3 curingPRD-26-0031 · 32 MPa at 7 daysPlan: ≥ 30 MPa · dimensions ± 3 mmApproved07:15
- PRD-26-0033 · stage 2Casting · 60 unitsStarted Thu 24 Sep · 31 of 60 castRunning52%
- PRD-26-0034 · stage 1Reinforcement · 40 unitsStarts Mon 28 Sep · materials requestedNextMR-26-0194
- PRD-26-0033 · stage 1ReinforcementClosed Wed 23 Sep · GCN-26-0620 · 2,700Closed23 Sep
- PRD-26-0031 · stage 3Curing · quality32 MPa at 7 days · approvedApproved27 Sep
The unit costs what the run cost, and quality is a decision on the stage.
The finished goods are received at the run's real cost: the materials consumed, each stage's cost unless it was rejected or kept out, and the extra cost on the order, over the quantity received. Quality is approved or rejected per stage against its inspection plan.
- A rejected stage stays out. Its cost never reaches the unit price; a recast is a stage of its own.
- Extra cost on the order. Crane hire, a subcontracted step, overtime: typed once, spread over the units.
- The standard cost is yours to update. Stack AI shows the gap; the product keeps its standard until you change it.
The receipt and the consumption post to ERP Core. See ERP Core
| Line | Per unit | The run |
|---|---|---|
| Materials · 7 lines, waste included | 820.00 | 98,400.00 |
| Reinforcement · stage 1 | 45.00 | 5,400.00 |
| Casting · stage 2 | 73.33 | 8,800.00 |
| Curing · stage 3 · approved | 53.33 | 6,400.00 |
| Finishing and QC · stage 4 | 33.33 | 4,000.00 |
| Extra cost · crane hire | 60.00 | 7,200.00 |
| Cost of the run | 1,085.00 | AED 130,200.00 |
Small things a plant notices in the first month.
Template stages, cloned
A product's stages and materials are set once; every order copies them with the quantities multiplied, and may still be edited on the order.
Waste on the bill
Waste per material is part of the bill, so the issue and the consumption carry it; nothing is typed twice.
Short stock stops at the note
An issue or a transfer beyond the batches on hand is refused when it is saved, not discovered at the count.
Single sign-on
Microsoft Entra ID, Google or OpenID Connect, on the accounts IT already manages.
Roles per document
View, create and manage for products, orders and each note type; approving a transfer, closing a stage and receiving finished goods are rights of their own.
Imports and feeds
The bill of materials from Excel, stock take and opening values by import; REST feeds for products, stock and notes since a date.
See your bill of materials in it.
A consultant loads one of your products with its stages and materials and runs a production order on it, from the materials issue to the finished goods at real cost, on a tenant set up for your country, with Stack AI switched on. The reply comes within one working day; the live demo takes forty-five minutes, online or at your office in the UAE, Saudi Arabia or Egypt.